2006 DBAR Productions Studio Remodel
 
Repainted the garage entrance area of the lounge as well. Bathroom is the open door to the right. Door into the control room would be to the right on the foreground side of the bathroom wall. | 7/25/06 7:23 AM
« | < | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | > | »


128 Images  |  Generated by JAlbum 6.5 & Chameleon skin  |  Help